BOOTLEGGER is put away for the winter and the endless list of projects must now resume.
· Replace cabin sole (started 01/2012)
· Rebuild hydraulics, with exception of backstay
· Re-stitch horseshoe holders
· Buy and install GPIRB (completed 12/2011)
· Buy and install VHF/AIS and remote in cockpit
· Install shelves in storage behind stove and icebox
· Replace spinnaker pole end
· Replace all bulbs with LEDs
· Replace roller furling cage
· Replace 3 DC panel switches
· Find leak in fresh water system
· Replace/change oil, antifreeze, all filters, and alternator belt
· Replace hose clamps below waterline
· Replace automatic bilge pump switch
· Replace two Ockam LCDs
· Replace Treadmaster at stem
· Clean and grease winches
· Install lazyjacks
· Re-bed handrails and toerails
· Replace chart storage and head zippers
· Replace aft lifelines